| Max continuous throughput | 40A |
|---|---|
| Input | Dual 10-54Vdc |
| Input failover | Microsecond switchover, no payload brownout |
| Priority input selection | Manual override of power draw hierarchy |
| Soft latch | Hardware-level. Outputs stay disengaged after upstream loss until the operator re-enables them |
| Telemetry | Flight-deck LCD, per-channel voltage and current—All live |
| Battery backup | Onboard, included as standard. Solidly encased in explosion proof containment for piece of mind |
| Auxiliary outputs | Expanded I/O |
| Polarity protection | Agnostic, hardware-level |
| Breaker protection | Resettable, with thermal throttling |
| Cooling | Active and passive, high thermal mass |
| Enclosure | Sealed, custom-machined aluminum |
| Classification | Ground Support Equipment (GSE) |
| Status | V0.3 testing. Contact for availability |
| Price | $11,000 USD, battery backup included |
For survey crews, first responders, and engineering firms, the PFMax removes the need for a hardwired cockpit integration. It runs off standard aviation auxiliary feeds, so enterprise payloads deploy across leased or mixed fleet airframes.
It carries the sensors and the processing laptop at the same time. The laptop draw is erratic while a GPU chews point clouds, and the 40A rating plus the thermal mass is sized for that on top of an active sensor array.
Heavy-draw gimbals, LiDAR, EO/IR arrays, gas detection units, multispectral cameras, SAR and radar, ground penetrating radar, and magnetometers.
Priority input selection also allows an independent reserve, such as an 8S lithium bank, to be set as primary. That isolates the aircraft alternator entirely while keeping instant failover available.
RESTRICTED DEPLOYMENT: Strict adherence to ManiWrks Aviation Products Liability limits applies. The PFMax is classified as Ground Support Equipment (GSE) / Cargo. ManiWrks mandates certified A&P mechanic installation for any active airframe power draw (typically via a dedicated high-amperage aircraft breaker). A signed Hold Harmless agreement and documented bench-testing are required prior to live deployment.